DNV Container Overhaul

Completing the Project

The generator package was fully disassembled and the container sent for blast. Blasting confirmed the container was heavity corroded.

  • Secondary Steel Replaced

  • Floor Sections Replaced

  • Doors Replaced

  • Weather Louvers Replaced

  • Container Modified to Suit New Design

  • Lift Certified

  • Blasted & Painted to C5M

  • Acoustics Replaced