DNV Container Overhaul
Completing the Project
The generator package was fully disassembled and the container sent for blast. Blasting confirmed the container was heavity corroded.
-
Secondary Steel Replaced
-
Floor Sections Replaced
-
Doors Replaced
-
Weather Louvers Replaced
-
Container Modified to Suit New Design
-
Lift Certified
-
Blasted & Painted to C5M
-
Acoustics Replaced